If the estimated construction cost is $20,000.00 or over; or any second story addition, or structural work is proposed, drawings must be wet stamped by a NYS Licensed Engineer or Architect, including a stamped truss layout. (Any addition over 300 square feet is presumed to cost in excess of $20,000).
Site needs to be maintained to comply with the Erosion and Sediment Control Plan along with a final grading inspection. If you have any questions regarding this requirement, contact Storm Water Management Department at (518) 783-6292.